PERMISSION subject
to:
|
1.
|
The development
hereby permitted shall be begun within three years from the date of
this permission.
Reason: To comply with the provision of Section 91 of the
Town and Country Planning Act 1990 as amended by Section 51 of the
Planning and Compulsory Purchase Act 2004.
|
2.
|
The development
hereby permitted shall not be carried out except in complete
accordance with the details shown on the submitted plans,
numbers
·
Location plan D-140
·
Landscape plan BLA329-10 A
·
Site section - D-420 G
·
Block plan D-113 F
·
Package treatment plant GA A
·
Existing elevation D-316
·
Existing elevation D-311
·
Existing site plan D-110
·
Proposed aerial view - D620 A
·
Proposed elevations D-310 F
·
Proposed elevations D-123 G
·
Proposed floor plans D-221 D
·
Proposed floor plans D-210 C
Reason: For the
avoidance of doubt and in the interests of proper planning.
|
3.
|
No development shall
take place above DPC level of the development hereby permitted
until samples and details of the materials to be used in the
construction of all external surfaces hereby permitted have been
submitted to and approved in writing by the Local Planning
Authority. Development shall be carried out in accordance with the
approved details.
Reason: To ensure the development has a satisfactory
external appearance in the interest of visual amenities in
accordance with Test Valley Borough Revised Local Plan (2016)
Policy E1.
|
4.
|
No external lighting
shall be installed unless in accordance with details that have been
submitted to and approved in writing by the Local Planning
Authority. The details shall include
plans and details sufficient to show the location, type,
specification, luminance and angle of illumination of all
lights/luminaires and a light spread diagram.
Reason: To safeguard the visual amenities of the area and
in the interest of protected species and to safeguard the
residential amenities of neighbouring properties in accordance with
Test Valley Borough Revised Local Plan (2016) Policies E1, E5 and
LHW4.
|
5.
|
Prior to the
commencement of demolition and construction activity including site
clearance or groundworks, a Construction Environment Management
Plan (CEMP) shall be submitted to the Local Planning Authority for
approval. The CEMP shall detail the significant risks posed to
amenity from the emission of noise, vibration, light and dust and
set out the mitigation measures to be employed to control such
emissions and mitigate the effects of such emissions on sensitive
land uses. Unless otherwise agreed by
the Local Planning Authority, construction activity shall only take
place in accordance with the approved CEMP.
Reason: In the
interest of the amenities of the local area and local residents in
accordance with Test Valley Borough Revised Local Plan (2016)
Policy E8.
|
6.
|
Prior to the
commencement of development, a scheme shall be submitted to and
approved in writing by the Local Planning Authority detailing the
method of cleaning wheels and chassis of all HGV's, plant and
delivery vehicles leaving the site and the means of keeping the
site access road and adjacent public highway clear of mud and
debris during site demolition, excavation, preparation and
construction. The scheme shall be
implemented in accordance with the approved details and shall be
installed and operational before any development commences and
retained in working order throughout the duration of the
development. No vehicles shall leave
the site in a condition whereby mud, clay or other deleterious
materials shall be deposited on the public highways.
Reason: In the
interests of highway safety and in accordance with Policy T1 of the
Test Valley Borough Revised Local Plan (2016).
|
7.
|
On the day on which
the first dwelling hereby permitted is first occupied for
residential purposes, the existing buildings on the application
site shall cease to be used for any purpose, and within three
months of that day, those existing buildings shall be demolished,
and the resultant materials cleared from the site in accordance
with details to be submitted and approved in writing with the Local
Planning Authority.
Reason: The site lies in an area where new dwelling units
are not normally permitted other than by replacement of the
existing agricultural buildings (in this instance by virtue of the
Class Q fallback position that would otherwise allow for their
conversion), in accordance with Test Valley Borough Revised Local
Plan (2016) Policy COM12.
|
8.
|
The development
hereby approved shall be designed and built to meet Regulation 36 2
(b) requirement of 110 litres/person/day water efficiency set out
in part G2 of Building Regulations 2015.
Reason: In the
interests of improving water usage efficiency in accordance with
policy E7 of the Test Valley Borough Revised Local Plan 2016.
|
9.
|
Notwithstanding the
provisions of the Town and Country Planning (General Permitted
Development) Order 2015 (or any order amending, revoking or
re-enacting that Order), no fences, gates, walls or other means of
enclosure shall be erected without the prior written consent of the
Local Planning Authority
Reason: In order that the Local Planning Authority can
exercise control in the locality in the interest of the local
amenities in accordance with Test Valley Borough Revised Local Plan
(2016) Policy COM2.
|
10.
|
The development
shall not be occupied until space has been laid out and provided
for the parking and manoeuvring of vehicles to enable them to enter
and leave the site in a forward gear in accordance with the
approved plan and this space shall thereafter be reserved for such
purposes at all times.
Reason: In the
interests of highway safety in accordance with Test Valley Borough
Revised Local Plan (2016) Policy T1.
|
11.
|
No development shall
take place above DPC level of the development hereby permitted
until full details of hard and soft landscape works have been
submitted and approved. Details shall include-where appropriate:
proposed finished levels or contours, means of enclosure and car
parking layouts where relevant.
Soft landscape works
shall include: planting plans; written specifications (including
cultivation and other operations associated with plant and grass
establishment); schedules of plants, noting species, plant sizes
and proposed numbers/densities.
The landscape works
shall be carried out in accordance with the implementation
programme and in accordance with the management plan.
Reason: To improve the appearance of the site and enhance
the character of the development in the interest of visual amenity
and contribute to the character of the local area in accordance
with Test Valley Borough Revised Local Plan (2016) Policy E1 and
E2.
|
12.
|
No development shall
take place above DPC level of the development hereby permitted
until a schedule of landscape implementation and maintenance for a
minimum period of 5 years has been
submitted to and approved in writing by the Local Planning
Authority. The schedule shall include details of the arrangements
for the phasing of the implementation and ongoing maintenance
during that period in accordance with appropriate British Standards
or other recognised codes of practise. Development shall be carried
out in accordance with the approved schedule.
Reason: To ensure
the provision, establishment and maintenance to a suitable standard
of the approved landscape designs to create and maintain the
appearance of the site and enhance the character of the development
in the interest of visual amenity and to contribute to the
character of the local area in accordance with Test Valley Borough
Revised Local Plan (2016) Policy E1 and E2.
|
13.
|
In the event that
contamination is found at any time during demolition and/or
construction works, the presence of such contamination shall be
reported in writing to the Local Planning Authority without delay
and development shall be suspended on the affected part of the site
until a remediation scheme for dealing with that contamination has
been approved by the Local Planning Authority. The approved
remediation scheme shall be implemented and, if requested, a
verification report, for the purpose of certifying adherence to the
approved remediation scheme, shall be submitted to the Local
Planning Authority prior to the site being brought in to use.
Reason: To minimise
the risks of pollution and to ensure the site is satisfactorily
de-contaminated in accordance with policy E8 of the Revised Borough
Local Plan
|
14.
|
Notwithstanding the
provisions of the Town and Country Planning (General Permitted
Development) Order 2015 (or any order revoking and re-enacting that Order with or without
modification), no windows/dormer windows [other than those
expressly authorised by this permission] shall be constructed.
Reason: In order that the Local Planning Authority can
exercise control in the locality in the interest of the local
amenities in accordance with Test Valley Borough Revised Local Plan
(2016) Policies E1, E2, LHW4
|
15.
|
Before the
development hereby permitted is commenced details, including plans
and cross sections, shall be submitted to and approved by the Local
Planning Authority of the existing and proposed ground levels of
the development and the boundaries of the site and the height of
the ground floor slab and damp proof course in relation thereto.
Development shall be undertaken in accordance with the approved
details.
Reason: To ensure satisfactory relationship between the
new development and the adjacent buildings, amenity areas and trees
in accordance with Test Valley Borough Revised Local Plan (2016)
Policy E1
|
16.
|
At least the first
4.5 metres of both access tracks measured from the nearside edge of
carriageway of the adjacent highway shall be surfaced in a
non-migratory material prior to the use of the access commencing
and retained as such at all times.
Reason: In the
interest of highway safety in accordance with Test Valley Borough
Revised Local Plan (2016) Policy T1
|
17.
|
Recommendations
included in Section 6.0 'Recommendations' of the Land at Staff
Road, Michelmersh, Updated Preliminary
Ecological Appraisal (Ecosupport,
December 2023) will be adhered to, with the enhancement features
being permanently retained and managed in accordance with the
approved plan. Photographs and a report of the implemented measures
shall be submitted by an ecologist for approval to the Local
Planning Authority prior to occupation.
Reason: To ensure
that the scheme complies with Policy E5 of the Test Valley Revised
Local Plan DPD and the NPPF.
|
18.
|
Notwithstanding the
provisions of the Town and Country Planning (General Permitted
Development) Order 2015 (or any order amending, revoking or
re-enacting that Order), the garage(s) and car ports hereby
approved shall at all times be available for the parking of
vehicles.
Reason: In order to maintain the approved on site parking provision and to reduce highway
congestion in accordance with Test Valley Borough Revised Local
Plan (2016) Policy T2.
|
19.
|
Prior to the
commencement of development a scheme detailing the removal of any
spoil or subsequent deposit within the holding of any spoil that
will result from the construction of the development shall be
submitted to and approved in writing by the local planning
authority.
Reason: To protect
the character and appearance of the area in accordance with policy
E2 of the Test Valley Revised Local Plan (2016).
|
20.
|
Prior to the
commencement of development the access shall be constructed in
accordance with the visibility splays detailed on drawing D113 F
and maintained as such at all times. Within these visibility splays
notwithstanding the provisions of the Town & Country Planning
(General Permitted Development) Order 2015 (or any Order revoking
and re-enacting that Order) no obstacles, including walls, fences
and vegetation, shall exceed the height of 1 metres above the level
of the existing carriageway at any time.
Reason: In the
interest of highway safety in accordance with Test Valley Borough
Revised Local Plan (2016) Policy T1
|
Note to
applicant:
|
1.
|
In reaching this
decision Test Valley Borough Council (TVBC) has had regard to the
National Planning Policy Framework and takes a positive and
proactive approach to development proposals focused on solutions.
TVBC work with applicants and their agents in a positive and
proactive manner offering a pre-application advice service and
updating applicants/agents of issues that may arise in dealing with
the application and where possible suggesting solutions.
|