
Havant Borough Council
Councillors:
36
Wards:
17
Committees:
35
Meetings (2025):
89
Meetings (2024):
96
Meeting
Planning Committee - Havant
Agenda
Published
Minutes
Pending
Meeting Times
Scheduled Time
Start:
Monday, 12th May 2025
5:30 PM
Monday, 12th May 2025
5:30 PM
End:
Monday, 12th May 2025
9:30 PM
Monday, 12th May 2025
9:30 PM
Meeting Status
Status:
New; Extraordinary
New; Extraordinary
Date:
12 May 2025
12 May 2025
Location:
Hurstwood Room, Public Service Plaza, Civic Centre Road, Havant, Hampshire PO9 2AX
Hurstwood Room, Public Service Plaza, Civic Centre Road, Havant, Hampshire PO9 2AX
Meeting Attendees

Vice-Chairman
Vice Chairman of Planning Committee

Committee Member
Chairman of Licensing Committee

Standing Deputy
Armed Forces Champion

Standing Deputy
Chairman of Governance Committee
Secretary
Democratic Services Officer
Mark Gregory
Expected
Secretary
Democratic Services Officer
Ernest Lam
Expected
Secretary
Democratic Services Officer
Lauren Maidens
Expected
Public
Spare Copies
Expected
Public
Public Copies (Council and Cabinet)
Expected

Chairman
Cabinet Lead for Planning and Environment and Chairman of Planning Committee

Standing Deputy
Cabinet Lead for Climate Emergency, Environment & Water Quality (Climate Change Champion)

Committee Member
Chairman of Overview and Scrutiny Committee

Committee Member
Deputy Mayor of the Council and Vice Chairman of Licensing Committee
Agenda
1
Apologies for Absence
To receive and record any apologies for absence.
2
Declarations of Interests
To receive and record any declarations of interests from Members present.
3
Applications for Development
Attachments:
- Document Apps for Dev Report 01 May 2025
3
APP/24/00405 - Pipeline from the reservoir to the north of Middle Park Way to Bedhampton Pumping Station, Meyrick Road, Havant.
Proposal: Hybrid application seeking: 1) Full permission for development of new pipelines to transfer water from Bedhampton Springs to fill the reservoir in the winter and draw it off to treat and supply when needed in the summer, comprising: construction of two predominantly underground pipes in tunnels linking the reservoir with the existing pumping station at Bedhampton with associated infrastructure including: emergency drawdown discharge structure at Hermitage Stream; construction of eight access shafts; upgrades to existing culverts close to shafts five, six and eight to manage flood risk; washout and air valve chambers (typically below ground), new plant at Bedhampton Pumping Station, modifications to Bedhampton 2 operational building and permanent diversion of Footpath 34 at Bedhampton Pumping Station. Outline application for an associated underground cross-connection chamber and above ground kiosk at the reservoir site with vehicular accesses for maintenance; and upgrades to existing culverts close to shafts five, six and eight to manage flood risk (amended description 6th March 2025). An Environmental Statement has been submitted with the application under the Town and Country Planning (Environmental Impact Assessment) Regulations 2017.
Additional Information
Additional Information
Attachments:
- Document HBC Pipeline Committee Report April 2025 Final 01 May 2025
- Document APPENDIX A - Site Location Plan 01 May 2025
- Document APPENDIX B - Red Line Boundary 01 May 2025
- Document APPENDIX C - P0 BD DUAL PIPELINE PLAN AND LONGSECTION 01 May 2025
- Document APPENDIX D - P1 DUAL PIPELINE PLAN AND LONGSECTION 01 May 2025
- Document APPENDIX E - P2 DUAL PIPELINE PLAN AND LONGSECTION 01 May 2025
- Document APPENDIX F - P9 DUAL PIPELINE PLAN AND LONGSECTION (Open Cut) 01 May 2025
- Document APPENDIX G - BEDHAMPTON 2 SITE PLAN 01 May 2025
- Document APPENDIX H - BEDHAMPTON AND SHAFT W1 SITE COMPOUND LAYOUT 01 May 2025
- Document APPENDIX I - SHAFT W5 SITE COMPOUND LAYOUT 01 May 2025
- Document APPENDIX J - SHAFT W6 SITE COMPOUND LAYOUT 01 May 2025
- Document APPENDIX K - SHAFT W1 GENERAL ARRANGEMENT 01 May 2025
- Document APPENDIX L - SHAFT W5 GENERAL ARRANGEMENT 01 May 2025
- Document APPENDIX M - SHAFT W6 GENERAL ARRANGEMENT 01 May 2025
- Document APPENDIX N - PIPELINE CROSS SECTION DETAILS 01 May 2025
- Document APPENDIX O - PUBLIC RIGHT OF WAY DIVERSION PLAN 01 May 2025
- Document 2025 06 07 APP 24 00405 Pipeline Deputation Statement 01 May 2025
- Document Pipeline - Submission to Committee 01 May 2025
- Document PW speech for 12 May 25 HTR pipelines planning meeting FINAL 01 May 2025
- Document Minutes Public Pack, 08/05/2025 Site Viewing Working Party 01 May 2025
- Document Supplementary Information Committee 12th May 2025 01 May 2025
Previous Meetings
Future Meetings
Join the Discussion
You need to be signed in to comment.
Sign in